VANCOUVER, BRITISH COLUMBIA–(Marketwired – June 20, 2017) – First Mining Finance Corp. (TSX VENTURE:FF)(OTCQX:FFMGF)(FRANKFURT:FMG) is pleased to announce the fourth set of assay results from its 28,500 metre diamond drill infill program on its 100% owned Goldlund Gold Project (“Goldlund”), located near the town of Sioux Lookout in northwestern Ontario, Canada.
Highlights:
Hole GL-17-005 intersected 313 metres of 0.81 grams per tonne gold
Including 2.0 metres of 42.15 grams per tonne gold

Hole GL-17-028 intersected 94 metres of 0.97 grams per tonne gold
Including 2.0 metres of 14.64 grams per tonne gold

Hole GL-17-060 intersected 14.0 metres of 6.05 grams per tonne gold
Including 2.0 metres of 38.54 grams per tonne gold

Hole GL-17-029 intersected 10.0 metres of 4.11 grams per tonne gold
Including 2.0 metres of 10.66 grams per tonne gold

Note: Assaying for the Goldlund 2017 drill program is being done by SGS at their laboratories in Red Lake, ON, and Burnaby, BC. Reported widths are drilled core lengths; true widths are unknown at this time. Assay values are uncut.
The goal of the 2017 drilling campaign at Goldlund is to upgrade Inferred resources into the Measured and Indicated categories, with the majority of the drilling focused on Zone 7 and Zone 1 (Figure 1), and to gain further knowledge of the geology and gold mineralization in preparation for Phase 2 drilling. The Phase 1 drilling program, comprising 100 holes (24,300 metres), was completed at the end of May and the remaining assay results from the Phase 1 program will continue to be released in batches as they are received. The Phase 2 program, which will include step-out exploration drilling, is expected to commence by the end of July 2017.
Since the commencement of drilling last January at Goldlund the Company has previously issued three press releases (April 25, 2017, May 2, 2017 and May 24, 2017) comprising a total of 37 drill hole results. With this latest press release, the Company has now released the results for 49 drill holes of which 46 drill holes contain significant intervals of gold mineralization, a gold mineralization success rate of 94%.
Commenting on the results, Patrick Donnelly, President of First Mining stated, “When we originally acquired Goldlund, we knew it was an asset with significant potential for unlocking further value. With 46 out of 49 drill holes so far containing significant gold mineralization, we’re confirming that Goldlund is one of our flagship projects.”
In addition, Keith Neumeyer, the Chairman of First Mining, stated, “It is very nice to see that the drill results being announced today remain consistent with our expectations that we felt existed prior to our decision to acquire the Goldlund project. The 100 holes drilled in Phase 1 will lead us to a much better understanding of the mineralized systems at Goldlund and will assist us in planning an exciting Phase 2 program.”
Table 1. Drill Hole Assay Results from Goldlund
Hole ID
 
From (m)
To (m)
Length (m)
Au g/t
 
GL-17-004
94
100
6
0.38
GL-17-004
and
124
130
6
1.09
 
inc
128
130
2
2.89
 
and
162
164
2
1.49
 
GL-17-005
24
337
313
0.81
 
inc
24
28
4
4.44
 
and inc
38
42
4
2.30
 
and inc
72
74
2
6.65
 
and inc
82
84
2
1.55
 
and inc
103.5
104
0.5
13.57
 
and inc
112
124
12
1.47
 
and inc
120
120.5
0.5
15.83
 
and inc
150
156
6
5.43
 
and inc
154
156
2
12.67
GL-17-005
and inc
216
218
2
15.48
 
and inc
262
266
4
1.23
 
and inc
270
272
2
42.15
 
and inc
290
291
1
1.97
 
and
441
605
164
0.42
 
inc
461
463
2
1.17
 
and inc
475
477
2
1.36
 
and inc
545
575
30
1.44
 
and inc
555
569
14
2.19
 
and inc
567
569
2
8.07
 
and inc
571
573
2
2.68
 
and inc
599
601
2
3.86
 
GL-17-006
108
132
24
0.44
 
inc
114
120
6
1.03
 
and inc
130
132
2
1.32
 
and
182
212
30
0.52
GL-17-006
inc
182
186
4
2.67
 
and
242
244
2
1.99
 
and
270
272
2
1.07
 
and
282
298
16
0.47
 
inc
296
298
2
1.64
 
and
312
324
12
0.45
GL-17-027
GL-17-027
58
64
6
3.68
 
inc
58
60
2
8.87
 
GL-17-028
150
162
12
0.98
 
inc
150
152
2
2.10
 
and inc
154
156
2
2.13
 
and
170
176
6
0.48
 
and
188
282
94
0.97
GL-17-028
inc
188
190
2
4.65
 
and inc
200
202
2
12.00
 
and inc
226
228
2
14.64
 
and inc
234
236
2
2.73
 
and inc
252
254
2
2.48
 
and inc
270
272
2
1.37
 
and inc
280
282
2
1.14
 
GL-17-029
212
222
10
4.11
 
inc
212
214
2
10.66
GL-17-029
and inc
220
222
2
9.76
 
and
240
248
8
1.28
 
inc
244
248
4
2.15
 
and
306
310
4
2.18
 
GL-17-036
136
150
14
1.44
 
inc
136
138
2
8.55
 
and
196
232
36
0.55
GL-17-036
inc
208
210
2
2.66
 
and inc
212
216
4
1.51
 
and inc
230
232
2
1.29
 
and
382
386
4
1.65
 
inc
382
384
2
2.48
 
GL-17-037
197
235
38
0.36
 
inc
197
199
2
1.86
GL-17-037
and inc
211
213
2
1.84
 
and inc
233
235
2
1.38
 
GL-17-045
24
102
78
1.96
 
inc
38
50
12
10.81
 
and inc
38
40
2
61.37
GL-17-045
and inc
68
72
4
1.02
 
and inc
76
78
2
1.40
 
and inc
92
94
2
4.44
 
and
148
150
2
3.94
 
GL-17-057
10
44
34
0.68
 
inc
10
12
2
1.20
 
and inc
14
16
2
1.41
GL-17-057
and inc
18
20
2
1.30
 
and inc
36
38
2
1.81
 
and inc
42
44
2
1.42
 
and
62
66
4
0.81
 
and
126
128
2
1.47
 
GL-17-060
46
60
14
6.05
 
inc
46
48
2
38.54
GL-17-060
and
82
152
70
0.50
 
inc
88
94
6
1.93
 
and inc
88
90
2
4.07
 
and inc
115
116.5
1.5
1.51
 
GL-17-061
38
40
2
1.32
GL-17-061
and
130
132
2
0.92
 
and
154
156
2
2.54
 
and
178
182
4
1.04
Assaying for the 2017 Goldlund drill program is being done by SGS at their laboratories in Red Lake, Ontario, and Burnaby, BC. Prepared samples are analyzed for gold by either Bulk Leach Extractable Gold (BLEG) assay techniques or by lead fusion fire assay with an atomic absorption spectrometry (AAS) finish. Multi-element analysis on the mineralized zones is also being undertaken by two-acid aqua regia digestion with ICP-MS and AES finish.
To view Figure 1. Plan Map, please visit the following link: http://media3.marketwire.com/docs/Figure1Map_FirstMining.pdf
Table 2. Drill Hole Locations
Hole ID
Azimuth º
Dip º
Length (m)
UTM East
UTM North
Section
GL-17-004
0
-90
257
545702
5527213
545700E
GL-17-005
180
-80
656
545702
5527213
545700E
GL-17-006
0
-90
326
545701
5527191
545700E
GL-17-027
180
-90
218
545801
5527238
545800E
GL-17-028
180
-77
299
545801
5527238
545800E
GL-17-029
0
-90
320
545800
5527187
545800E
GL-17-036
180
-80
548
545600
5527157
545600E
GL-17-037
0
-90
365
545600
5527136
545600E
GL-17-045
180
-80
302
545549
5527193
545550E
GL-17-057
180
-80
233
545501
5527190
545500E
GL-17-060
0
-90
278
545503
5527143
545500E
GL-17-061
0
-90
269
545501
5527105
545500E
To view Figure 2. Cross-Section through the Goldlund Project, please visit the following link: http://media3.marketwire.com/docs/Figure2Map_FirstMining.pdf
Gold observed during the current drilling program at Goldlund occurs both as fine disseminations in quartz vein stockworks and as more discrete larger grains up to 2 mm spatially associated with pyrite in the quartz veins. Calaverite, a gold telluride mineral, has been noted occasionally in higher grade intervals on fracture surfaces in the quartz veins. Higher grade gold distribution in the granodiorite dike is often, but not always, associated with zones of more intense quartz stockworking and potassic alteration. Figure 2 above displays a cross- section of the geology and gold mineralization with drill holes GL-17-30 to GL-17-37.
QA/QC Procedures
The QA/QC program for the 2017 drilling program at Goldlund consists of the submission of duplicate samples and the insertion of certified reference materials and blanks at regular intervals. These are inserted at a rate of one standard for every 20 samples (5% of total) and one blank for every 30 samples (3% of total). The standards used in the 2017 program consist of 5 different gold grades ranging from 1 to 9 g/t, and are sourced from CDN Resource Laboratories in Langley, BC. Blanks have been sourced locally from barren granitic material.
Field duplicates from quartered core, as well as ‘coarse’ or ‘pulp’ duplicates taken from coarse reject material or pulverized splits, are also submitted at regular intervals with an insertion rate of 4% for field duplicates and 4% for coarse or pulp duplicates. Additional selected duplicates are being submitted for screened metallic fire assay analysis and to an umpire lab for check assaying. SGS also undertake their own internal coarse and pulp duplicate analysis to ensure proper sample preparation and equipment calibration.
Dr. Chris Osterman, P.Geo., CEO of First Mining, is the “qualified person” for the purposes of National Instrument 43-101 Standards of Disclosure for Mineral Projects and he has reviewed and approved the scientific and technical disclosure contained in this news release.
ABOUT THE GOLDLUND PROJECT
The Goldlund deposit is situated within a land package of approximately 280 square kilometres (28,000 hectares) referred to as the Goldlund Gold Project. The Property has a strike-length of over 50 kilometres in the Wabigoon Subprovince. Goldlund is an Archean lode-gold project located in northwestern Ontario, approximately 60 kilometres from the township of Dryden. The claims that make up the land package cover the historic Goldlund and Windward mines.
On January 9, 2017, the Company announced an initial mineral resource estimate for Goldlund. At a 0.4 g/t Au cut-off grade, the Goldlund deposit contains pit constrained Indicated Resources of 9.3 million tonnes at 1.87 grams per tonne or 560,000 ounces of gold. At a 0.4 g/t Au cut-off grade, the Goldlund deposit contains pit constrained Inferred Resources of 40.9 million tonnes at 1.33 grams per tonne or 1,750,000 ounces of gold. The technical report for this resource estimate has been filed on SEDAR and is also available on the Company’s website at www.firstminingfinance.com.
ABOUT FIRST MINING FINANCE CORP.
First Mining is a mineral property holding company whose principal business activity is to acquire high quality mineral assets with a focus in the Americas. The Company currently holds a portfolio of 25 mineral assets in Canada, Mexico and the United States with a focus on gold. Ultimately, the goal is to continue to increase its portfolio of mineral assets through acquisitions that are expected to be comprised of gold, silver, copper, lead, zinc and nickel.
For further information, visit our website at www.firstminingfinance.com.
ON BEHALF OF FIRST MINING FINANCE CORP.
Keith Neumeyer, Chairman
Cautionary Note Regarding Forward-Looking Statements
This news release includes certain “forward-looking information” and “forward-looking statements”(collectively “forward-looking statements”) within the meaning of applicable Canadian and United States securities legislation including the United States Private Securities Litigation Reform Act of 1995. All statements, other than statements of historical fact, included herein, without limitation, statements relating the future operating or financial performance of the Company, are forward-looking statements.
Forward-looking statements are frequently, but not always, identified by words such as “expects”, “anticipates”, “believes”, “intends”, “estimates”, “potential”, “possible”, and similar expressions, or statements that events, conditions, or results “will”, “may”, “could”, or “should” occur or be achieved. Forward-looking statements in this news release relate to, among other things: the Company’s anticipated timing of the completion of the current Phase 1 drilling program at the Goldlund project; the potential results of the remainder of the Phase 1 drilling program and the timing of the dissemination of such results by the Company; plans relating to a Phase 2 drilling program at the Goldlund project and the anticipated timing of such a program; any upgrade to, or expansion of, the resources on the Goldlund project; and the potential for further value to be unlocked at the project. There can be no assurance that such statements will prove to be accurate, and actual results and future events could differ materially from those anticipated in such statements. Forward-looking statements reflect the beliefs, opinions and projections on the date the statements are made and are based upon a number of assumptions and estimates that, while considered reasonable by the respective parties, are inherently subject to significant business, economic, competitive, political and social uncertainties and contingencies.
Many factors, both known and unknown, could cause actual results, performance or achievements to be materially different from the results, performance or achievements that are or may be expressed or implied by such forward-looking statements and the parties have made assumptions and estimates based on or related to many of these factors. Such factors include, without limitation, the results of future exploration efforts at the Goldlund project; management’s discretion to refocus its exploration efforts; fluctuations in the spot and forward price of gold, silver, base metals or certain other commodities; fluctuations in the currency markets (such as the Canadian dollar versus the U.S. dollar); changes in national and local government, legislation, taxation, controls, regulations and political or economic developments; risks and hazards associated with the business of mineral exploration, development and mining (including environmental hazards, industrial accidents, unusual or unexpected formations, pressures, cave-ins and flooding); the presence of laws and regulations that may impose restrictions on mining; employee relations; relationships with and claims by local communities and indigenous populations; availability and increasing costs associated with mining inputs and labour; the speculative nature of mineral exploration and development; and title to properties. Readers should not place undue reliance on the forward-looking statements and information contained in this news release concerning these times. Except as required by law, First Mining does not assume any obligation to update the forward-looking statements of beliefs, opinions, projections, or other factors, should they change, except as required by law.
Neither the TSX Venture Exchange nor its Regulation Services Provider (as that term is defined in the policies of the TSX Venture Exchange) accepts responsibility for the adequacy or accuracy of this release.
Copyright © 2017 Marketwired. All Rights ReservedThe above news release has been provided by the above company via the OTC Disclosure and News Service. Issuers of news releases and not OTC Markets Group Inc. are solely responsible for the accuracy of such news releases.

Related Posts Plugin for WordPress, Blogger...